www.alphaindu.org

 
  Date: 
 
        Home           Feedback         Contact Us
   
5 In case of one surface being more porous than the other, apply adhesive on the higher porous surface, later.
6 Both surfaces should be brought together in proper alignment with each other and pressed firmly to ensure uniform contact & even spreading of the adhesive.
7. The application process should not ideally be over 15 minutes
8. The bonded area should be kept under pressure. Pressure can be removed after 6-8 hrs. before usage of the bonded items. Complete curing is achieved in 24hrs.
9 Application can be done by roller/brush/spatula/evenly notched applicator.
   
   
   
 
  next >> 1 2 3 4
        Copyright alphaindu, 2006 all rights reserved

:: Home :: Products :: Feedback :: Contact Us