4 |
Open time : 12-15 minutes |
5 |
Pressing time for handling strength:
(a) HPL to particle board/MDF/Plywood 6-8 hrs @
25degree centigrade RH 65% OR 4 min @ 90 degree
centigrade & 80 bar pressure |
|
(b) Wood to wood 6-8 hrs @ 25 degree centigrade RH
65% |
6 |
Coverage : 3.5sq mt/kg |
Application
Instructions |
1. |
Surfaces to be bonded
should be free from oil/grease/dust & excess
moisture. |
2. |
Surfaces to be bonded
should be properly leveled. |
3. |
Stir contents before
use. |
4. |
Apply even coats on both
the surfaces. |